On the Road Again
Fri., Jan. 28, 2000
Here are the highlights of the I-35 bottleneck plan, as it currently stands.
Southbound:
1 Close the entrance ramp at Hancock and 381/2 St.2 Turn the 26th St. exit into a 32nd St. entrance.
3 Revamp the 26th St. entrance into a Manor Rd. exit.
4 Build an auxiliary lane from 32nd St. to Manor Rd. to allow for safer entry and exit.
5 Widen frontage road at 32nd St.
Northbound:
6 Close the Manor Road entrance.7 Relocate the 32nd St. entrance (7a) south to the 38th St. exit (7b) and add approximately 1,100 feet of acceleration lane (7c).
Got something to say on the subject? Send a letter to the editor.